Saturday, October 25, 2008

New Glouster Toll Plaza office addition

This bulding addition for a 12' square office for the MTA is $140,000.

Just Molly

Tuesday, October 21, 2008

Eagle Lake new water wells

This picture is of two wells we installed in Eagle Lake this summer. The wells were drilled under a separate contract, we installed the buried pipe to the wells, installed the pumps and top 12' section of the well.

Cascade Brook Pump Station Saco


This is a picture of a pump station we are building in Saco across the street from Aquaboggan. To look at the sand you would think this job was at the beach. The 330 excavator in the picture is our largest excavator.

Ogunquit 10/21/08

I went to a prebid in Ogunquit this morning. The sewer pump station I looked at is between two hotels on the beach. The is the view from the back lawn of the pump station.

Monday, October 13, 2008

The digging begins



Finally I am replacing the sills on the garage. If you are out of shape and need some exercise, try sill replacement.

Nora enjoying the fall sun.

Nora


I love this picture Lynn took of Nora.