This picture is of two wells we installed in Eagle Lake this summer. The wells were drilled under a separate contract, we installed the buried pipe to the wells, installed the pumps and top 12' section of the well.
This is a picture of a pump station we are building in Saco across the street from Aquaboggan. To look at the sand you would think this job was at the beach. The 330 excavator in the picture is our largest excavator.
I went to a prebid in Ogunquit this morning. The sewer pump station I looked at is between two hotels on the beach. The is the view from the back lawn of the pump station.